BuildsConnect

Home/What’s in a lead

What’s actually in a lead

Every field we hand you, what it means, and how sure we are, including the ones that are often blank. A blank you can trust is worth more than a guess you can’t.

The project

Read straight off the NSW planning record.

No inference in this half. Every field here is something a council published.

FieldWhat it is
AddressThe site as stated on the application, resolved against G‑NAF. We never substitute a near‑miss: if the number, unit or range doesn’t match exactly the address stays unresolved rather than pointing at the house next door.
CouncilThe consent authority. Stated on the record.
DA / CDC referenceThe application number. Every lead carries one, so you can check it against the council’s own portal before you call.
Stated cost of worksThe cost declared on the application, or taken from a construction or occupation certificate, and the lead tells you which. A figure declared at lodgement is applicant‑declared and unverified by any authority; a certificate figure is not what was declared at lodgement. Where no live application states a cost, the cell says so instead of showing a dash.
Lodged & determined datesWhen it entered and left assessment. Stated on the record.
StageWhere it sits in the consent lifecycle.
Hazard overlaysBushfire, flood, acid sulfate, mine subsidence, heritage, on the compliance feeds (AFSS, pool-barrier, termite) and the Site & Hazard Report. Builder Leads and the vertical lead packs do not carry hazard chips today. Where shown they are indicative, verify on a 10.7 certificate; absence of a flag means we hold no flag, not that the site is clear. Acid sulfate now carries its EPI class, and the split matters: measured statewide 3 Aug 2026, 79.6% of acid-sulfate flags are Class 5, a buffer near Class 1–4 land, not a finding on the lot. Only 7.2% of sites carry a genuine Class 1–4 finding. Class 1–4 renders as a hazard; Class 5 is shown as a quieter annotation so it never reads as risk it isn’t.

The people

The part you’re paying for, so it’s the part we label hardest.

Who the documents name, how to reach them, and exactly how confident we are in each channel.

FieldWhat it is
RoleApplicant, planner, architect, surveyor, engineer, certifier, QS, arborist or heritage consultant, read from the lodged documents. The lead says how we know: an explicit “all enquiries to”, a signature block, or a title‑page attribution. Those are not equally strong and they are not shown as though they were.
Name & companyThe person and the firm named on the documents. Nothing is invented, where the documents name only a firm, you get a firm.
PhoneThe published business number. Format‑checked, not carrier‑verified, we have not rung it, so it is described as published, never as verified.
EmailShown with its verification status stated: confirmed deliverable and when, checked with an inconclusive result, or never checked. Most are never checked, which means we haven’t got to it, not that it’s bad. The one address we withhold is one we checked and found undeliverable; serving that with a footnote would be serving a wrong answer.
Mailbox typeWhat the address is for. A privacy or legal contact is a real mailbox and a poor lead, and so is a recruitment address, we say which you’re looking at rather than letting you assume it’s the sales desk.
Builder & ABNWho the record says is building it, resolved against the Australian Business Register, with the resolution rate shown. Where a name couldn’t be resolved to an ABN, the lead says so instead of guessing.
Owner contactNot included. Owner details sit behind a signed agreement and never appear on a standard lead, an export, or a sample pack.

Before you buy

Three things we’d rather you knew now than found out later.

A blankis a real answer. Coverage is not flat, where we hold no contact the lead shows an honest blank, never a plausible guess. Coverage rates are published per list, before you pay.
30.7%of the bushfire planner list has a contact on record, and 17.3% is verified deliverable. Two very different numbers, and we publish both. Anyone quoting one is quoting the flattering one.
CheckableEvery lead carries its DA reference. Take it to the council’s own portal and confirm it before you pick up the phone. We’d rather you did.